Solution
  • Shore Power Project in Lianyungang

    Project size: 4MWh

    locations: Lianyungang, Jiangsu

    Operation time: April, 2021

    Project overview: The ESS can effectively improve the operation efficiency of port power grid and reduce the cost of shore power terminal, which is of great significance to the safe production of port and the popularization and application of marine shore power technology.


168开奖网官网平台>>168彩票开奖网>>幸运168飞艇开开奖